toll-less motorway Jaca-Santa Cilia

Four two-carriageway bridges (11.80 m), of two beams of between 28-49 m long and between 4-18 isostatic spans, with piles executed “in situ”.

To be highlighted:

  • The beams are mounted with the required cant and longitudinal slope, easing the adjustment of the board to the outline.
  • The minimum number of beams ensures a high assembling performance.
  • The fewer amount of elements, lines and shadows make this typology to be deemed better aesthetically than the double T.
  • The permit lodging facilities inside them, when requested by the client.
  • They are more appropriate than the double T in the event of low passage over river beds.
  • Cantilever slabs are self-supporting and include anchorages for provisional rails during the execution of the slab, side shutters and auxiliary anchorages for the metal sheathing of the impost.
  • The reordering of floor slabs is adapted to the curved outline of the bridges.
Work Toll-less motorway A-21, section Jaca (Oeste) - Santa Cilia de Jaca (Huesca)
Building company FCC
Administration Directorate General of Roads, Ministry of Development
Products 7,000 m2 of U-beams, 31,000 m2 of reinforced floor slab with lattice for cantilever and 7,800 m2 of prestressed floor slab.